-------------------- | OIL TERMINAL OF PORT-GENTIL |

In service since April 1986, the work consisted of a hydra's quay of 5,5 meters (dragable at 7 hydra meters) long with 180 hydro meters with two reback at right angel of 45 meters.

Then, it supplies with three quay ports for the type of ship: the platform petroliers. A paving stone of to large meters (1800 m²) and a band of 15 meters (2700 m²) consisting of pave trief, a board quay at its longer in the share index of 3,50 hydra meters.





 
The supply of ship with oil Dieseland water ensures thanks to the leaders placed in the technical trenches.
   
Those last one are furnished further to be allowing the direct loading to specific products at oil-exploitation (cement, bentonite). The lands heights realized by hydraulic elevation present a modified surface of 26 463 m².